Pilot Water Systems
Size
NA
Services/Features
Lightning Protection
Grounding and Bonding Layout
Industry Sector
Industrial
Completion Date
2024
This project involved the design and implementation of a robust electrical and lightning protection system for the Pilot Water Solutions Sparta Facility. The design focused on detailed routes for aluminum and copper lightning protection conductors, incorporating air terminals, bonding conductors, and grounding techniques for tanks, light poles, and critical infrastructure. The deliverables included bill of materials, part specifications, and installation notes that ensured compliance with lightning protection standards.