Building 4200 - HVAC Upgrade
For Building 4200, our team delivered a complete suite of MEP design using Autodesk Revit software to support a high-functioning facility. This included the design/installation of a new energy recovery ventilator (ERV) that utilized an energy recovery system for energy efficiency. The services also included sizing/design of a new air-cooled chiller, various hydronic accessories, and electrical system modification to accommodate the new mechanical equipment.
Electrical and plumbing systems were developed with a strong emphasis on code compliance, usability, and system clarity. Our design incorporated panel schedules, safety disconnects, and optimized lighting/power layouts—alongside plumbing systems that support critical usage areas such as restrooms, mechanical rooms, and janitorial spaces.
(Project completed through partnership with another firm)
Size
~27,000 SF
Services/Features
Mechanical
Electrical
Industry Sector
Government
Completion Date
2024
3D LiDAR scanning was conducted as part of this project to capture detailed site conditions. A link to view the scanned data is available [here].