Prescott Group - 5959 Corporate Drive

  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button

At 5959 Corporate Drive, our team conducted a full arc flash and load analysis to help the building owner ensure safety, compliance, and system reliability. We began with a field survey of the electrical infrastructure, followed by in-depth studies to assess breaker coordination, connected loads, and incident energy levels in accordance with NFPA 70E.


The study delivered clear, actionable insights—including updated arc flash labels, PPE requirements, and recommendations for breaker settings—to reduce risk and support informed decision-making. Our work not only enhanced on-site safety but also positioned the facility for more efficient operations and future upgrades with confidence.




Size


~400,000 SF


Services/Features


Arc Flash Study


Coordination Study


Load Analysis


Completion Date


2025